Fiche récapitulative
- Transports - Transports et entreposage
The project supports multiple schemes of railway infrastructure with the aim to: (i) upgrade, modernise and renew trans-European networks (TEN-T) railway lines (ii) deploy European Rail Traffic Management System (ERTMS) on railway lines and retrofit of maintenance vehicles with ERTMS equipment (iii) improve safety of level crossings.
The project is expected to increase the quality of rail services provided in the Czech Republic, as well as promote travel by rail, reducing the use of road transport and the associated negative impacts on the local environment, road safety and GHG emissions and, thereby, contribute to the sustainable transport in line with EU objectives. The project is mostly located in EIB Cohesion Priority Regions and by facilitating access promotes regional development. Several schemes are aimed at increasing the capacity of the existing lines and removing bottlenecks, and thus allowing traffic growth. For some sections, where the works will allow to increase maximum speeds or prevent reduction of maximum speed, it may also generate time savings for passengers. The project will also present environmental and safety benefits due to preventing modal shift from rail to road because of better rail services and improved safety of level crossings, as well as related vehicle operating cost savings. Finally, by means of contributing to achieving interoperability of the EU railway system, the project is expected to improve competitiveness of rail vis à vis other modes; and thereby, enhance sustainable transport.
The project consists of multiple schemes of railway infrastructure in particular related to (i) upgrading, rehabilitation and renewal of TEN-T railway lines, (ii) deployment of European Rail Traffic Management System (ERTMS) on railway lines, retrofit of maintenance vehicles with ERTMS equipment, improvement of cybersecurity of Promoter's ICT systems and (iii) improving safety of level crossings.
The project is expected to improve the quality and capacity of rail infrastructure, bring it to compliance with the TEN-T requirements and applicable TSIs. For some sections, where the works will allow to increase maximum speeds or prevent reduction of maximum speed, it may also generate time savings for passengers. It will also present environmental and safety benefits due to promoting shift from road to rail expected to take place because of better rail services, as well as related vehicle operating cost savings. Safety benefits will also be linked to improvements of level crossings. Finally, by means of contributing to achieving interoperability of the EU railway system, the project is expected to improve competitiveness of rail vis à vis other modes; and thereby, enhance sustainable transport and present environmental and safety benefits due to preventing modal shift from rail to road.
The project is located in multiple cohesion regions.
The EIB advantageous and flexible loan contributes to diversification and stability of financing of the Czech Sovereign. Maturity of the tranches and longer grace periods combined with a possibility of currency and/or interest rates conversion add up to the Borrower's comfort.
The project will consist of multiple schemes and their compliance with the requirements of the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by Directive 2014/52/EU and the development consents will be reviewed during appraisal. The project's potential impacts on protected areas and species, in accordance with the Habitats Directive (92/43/EEC) and Birds Directive (2009/147/EC) will also be appraised. All else equal, the project is expected to have a positive environmental impact by helping the railways to maintain modal share. Furthermore, the project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate change mitigation.
The Bank will require the promoter to ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).
Documents
Informations et observations générales
La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.
Informations aux médias
Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.
Mécanisme de traitement des plaintes
Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.
Tolérance zéro face à la fraude et à la corruption
La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.
Publications connexes